Sailing Squibvideo
Squib's Refit - Galley board - Flood damage assessment - Gimballing the stove /111
20 de marzo de 2025 · 16 min · 788 vistas
¿Qué cubre este video?
The crew of the vessel *Squib* performs a series of interior refit tasks while assessing the boat's condition following a flood event. After curing for two days, the new galley board is sanded, rounded at the edges, and filled with epoxy to address voids and screw holes.0:13 The crew cuts the 2-meter board to a final length of 2.04 meters, requiring precise trimming to accommodate the hull's curvature and a cutout for a navigation light cable.6:22 Following the installation of the galley board, the crew installs sliding rails for a storage drawer.10:33
The refit also includes modifying the gas stove mounting to allow for gimbaling.12:11 The crew uses temporary spacers to determine the necessary thickness for the stove's suspension, aiming to ensure the unit can swing freely during heavy seas.13:25 The project involves measuring the stove's height and clearance for the gas line to avoid interference with the bulkhead.15:31 Separately, the crew inspects *Squib* after a flood, noting that while the boat remained dry inside, significant amounts of mud and sand accumulated around the hull and under the keel.3:24
Más de Sailing Squib
De Sailing Squib — ve el barco, la tripulación y cada video analizado del canal.
The Sailing Directory Newsletter
Un correo electrónico con los mejores hallazgos de la flota: los momentos, barcos e historias que valen tu tiempo de visualización. Ingresa tu propia dirección para obtener tu propia copia.



