Sailing Squibvidéo

Squib's Refit - Galley board - Flood damage assessment - Gimballing the stove /111

20 mars 2025 · 16 min · 788 vues

Ce que couvre cette vidéo

The crew of the vessel *Squib* performs a series of interior refit tasks while assessing the boat's condition following a flood event. After curing for two days, the new galley board is sanded, rounded at the edges, and filled with epoxy to address voids and screw holes.0:13 The crew cuts the 2-meter board to a final length of 2.04 meters, requiring precise trimming to accommodate the hull's curvature and a cutout for a navigation light cable.6:22 Following the installation of the galley board, the crew installs sliding rails for a storage drawer.10:33

The refit also includes modifying the gas stove mounting to allow for gimbaling.12:11 The crew uses temporary spacers to determine the necessary thickness for the stove's suspension, aiming to ensure the unit can swing freely during heavy seas.13:25 The project involves measuring the stove's height and clearance for the gas line to avoid interference with the bulkhead.15:31 Separately, the crew inspects *Squib* after a flood, noting that while the boat remained dry inside, significant amounts of mud and sand accumulated around the hull and under the keel.3:24

Regarder sur YouTube

Plus de vidéos de Sailing Squib

Sailing Squib - May 2026/3sept. 2026Sailing Squib May 2026 /2août 2026Sailing Squib - Contemporary Witnessjuil. 2026Sailing Squib - May 2026 /1juil. 2026

De Sailing Squib — voir le bateau, l'équipage et chaque vidéo analysée de la chaîne.

The Sailing Directory Newsletter

Un e-mail avec les meilleures trouvailles de la flotte — les moments, les bateaux et les histoires qui valent la peine d'être regardés. Entrez votre adresse pour recevoir votre propre exemplaire.

Signaler un problème