Salt & Tarvideo

Salt & Tar: Ep.174- Windlass (pt.1) Alignment

13 de enero de 2022 · 23 min · 61K vistas

¿Qué cubre este video?

Garrett and Ruth prepare to install a manual windlass on the deck of their custom-built vessel, Red Aviva.0:21 The project requires aligning the windlass gypsy with the bowsprit roller to ensure smooth chain flow while avoiding interference with the Samson post.4:03 After cleaning and greasing the windlass internals, the crew measures the deck beams and bulwark stanchions from below to determine the optimal mounting position.5:38 They create a cardboard template to verify the fit between structural beams and plan to fabricate a backing block to reinforce the deck.19:26 The installation process involves drilling mounting holes, sealing the end grain with epoxy, and bedding the hardware with butyl tape.18:27 Future steps include building a chain chute to direct the anchor rode into a forward locker and potentially adding bracing between the Samson post and the forward deck beam to handle the mechanical load of the windlass.18:45 Proper alignment and structural reinforcement are essential for a reliable anchor handling system.

Ver en YouTube

Más de Salt & Tar

Salt & Tar: Ep.356- Dock Lifeago 2026Salt & Tar: Ep.355- Serenely Afloat in a Hustling Harborago 2026Salt & Tar: Ep.354- Enjoying the Sensation of Floatingago 2026Salt & Tar: Ep.353- Launch Day!ago 2026

De Salt & Tar — ve el barco, la tripulación y cada video analizado del canal.

The Sailing Directory Newsletter

Un correo electrónico con los mejores hallazgos de la flota: los momentos, barcos e historias que valen tu tiempo de visualización. Ingresa tu propia dirección para obtener tu propia copia.

Reportar un problema