Salt & Tarvídeo

Salt & Tar: Ep.174- Windlass (pt.1) Alignment

13 de janeiro de 2022 · 23 min · 61K visualizações

O que este vídeo aborda

Garrett and Ruth prepare to install a manual windlass on the deck of their custom-built vessel, Red Aviva.0:21 The project requires aligning the windlass gypsy with the bowsprit roller to ensure smooth chain flow while avoiding interference with the Samson post.4:03 After cleaning and greasing the windlass internals, the crew measures the deck beams and bulwark stanchions from below to determine the optimal mounting position.5:38 They create a cardboard template to verify the fit between structural beams and plan to fabricate a backing block to reinforce the deck.19:26 The installation process involves drilling mounting holes, sealing the end grain with epoxy, and bedding the hardware with butyl tape.18:27 Future steps include building a chain chute to direct the anchor rode into a forward locker and potentially adding bracing between the Samson post and the forward deck beam to handle the mechanical load of the windlass.18:45 Proper alignment and structural reinforcement are essential for a reliable anchor handling system.

Assistir no YouTube

Mais de Salt & Tar

Salt & Tar: Ep.356- Dock Lifeago. de 2026Salt & Tar: Ep.355- Serenely Afloat in a Hustling Harborago. de 2026Salt & Tar: Ep.354- Enjoying the Sensation of Floatingago. de 2026Salt & Tar: Ep.353- Launch Day!ago. de 2026

De Salt & Tar — veja o barco, a tripulação e cada vídeo analisado do canal.

The Sailing Directory Newsletter

Um e-mail com os melhores achados da frota — os momentos, barcos e histórias que valem o seu tempo de visualização. Insira seu endereço para receber sua própria cópia.

Reportar um problema