Vie d'écumevideo

Woodwork painting 2nd night

10 de agosto de 2020 · 10 min · 315 vistas · Plage des Pesquiers

¿Qué cubre este video?

Refinishing the interior woodwork of a 7-meter sailboat requires careful planning, particularly when applying paint in high-humidity conditions. To avoid moisture damage and ensure proper curing, the owner painted the cabin interior and removable floorboards overnight, utilizing solar-powered LED lamps for illumination.0:01 These portable lights provided consistent, bright coverage throughout the night, serving as an effective alternative to the boat's existing yellow-tinted interior bulbs.2:22 The project involved painting handrails, cabin panels, and floorboards to achieve a lighter, sand-colored finish inspired by modern production boats like Dufour.5:58 Despite using masking tape, some touch-ups are required to cover paint splatters on adjacent surfaces.3:43 The owner also plans to replace rusted bolts and nuts on the reinstalled panels.7:49 During the process, the boat remained moored near a ferry route, where wake from passing vessels caused significant movement.9:30 The solar lamps also function as a temporary security lighting system on deck when the masthead light is unavailable.8:53

Ver en YouTube

Barcos en este video

Beneteau Oceanis 440Su barco

Más de Vie d'écume

Goodbye CORAIL !!!sep 2026The FUTURE of Vie d'écume and mineago 2026Plans have changed, we're doing the Spanish coast, Toulon will have to waitago 2026Watch out for the orcas of Gibraltar, I'm staying on guardago 2026

De Vie d'écume — ve el barco, la tripulación y cada video analizado del canal.

The Sailing Directory Newsletter

Un correo electrónico con los mejores hallazgos de la flota: los momentos, barcos e historias que valen tu tiempo de visualización. Ingresa tu propia dirección para obtener tu propia copia.

Reportar un problema