Project Brupegvideo

Second Sea Trial didnt go to plan - Project Brupeg Ep.341

4 de febrero de 2024 · 37 min · 54K vistas

¿Qué cubre este video?

The 10-year rebuild of the fishing trawler Brupeg concludes with sea trials to test mechanical and electrical systems. Before departure, the crew installs a roof-mounted air conditioning unit using stainless steel angle mounts welded to the wheelhouse roof and secures loose helm seating.0:51 During the initial sea trial, the generator fails due to a blown fuel return line caused by inadequate hose clamps on pressed-steel fittings.25:31 The owner identifies the root cause as a pressurized fuel system error and plans to replace the fittings with hydraulic push-lock connectors and a proper return line plumbed into a T-fitting before the fuel pump.27:04 Additionally, the crew calibrates the engine’s oil and coolant temperature sensors, which were reading 10 degrees Celsius too high, by comparing gauge data against a handheld thermometer.34:20 The team also performs network diagnostics on the boat's radar and instrumentation systems to isolate data streams.28:25 The vessel remains operational for short coastal runs despite ongoing challenges with onboard power management and pet accommodation.

Ver en YouTube

Más de Project Brupeg

What caused the steering to fail - Project Brupeg Ep.463oct 2026CHAOS! & our first Night Time Trailer Haul Out - Project Brupeg Ep.462sep 2026Look, It's possible we should have cleaned this before now... Project Brupeg Ep.461sep 2026The Ridiculously Powerful Davit Winch - Project Brupeg Ep.460sep 2026

De Project Brupeg — ve el barco, la tripulación y cada video analizado del canal.

The Sailing Directory Newsletter

Un correo electrónico con los mejores hallazgos de la flota: los momentos, barcos e historias que valen tu tiempo de visualización. Ingresa tu propia dirección para obtener tu propia copia.

Reportar un problema