Project Brupegvideo

Second Sea Trial didnt go to plan - Project Brupeg Ep.341

4 February 2024 · 37 min · 54K views

What this video covers

The 10-year rebuild of the fishing trawler Brupeg concludes with sea trials to test mechanical and electrical systems. Before departure, the crew installs a roof-mounted air conditioning unit using stainless steel angle mounts welded to the wheelhouse roof and secures loose helm seating.0:51 During the initial sea trial, the generator fails due to a blown fuel return line caused by inadequate hose clamps on pressed-steel fittings.25:31 The owner identifies the root cause as a pressurized fuel system error and plans to replace the fittings with hydraulic push-lock connectors and a proper return line plumbed into a T-fitting before the fuel pump.27:04 Additionally, the crew calibrates the engine’s oil and coolant temperature sensors, which were reading 10 degrees Celsius too high, by comparing gauge data against a handheld thermometer.34:20 The team also performs network diagnostics on the boat's radar and instrumentation systems to isolate data streams.28:25 The vessel remains operational for short coastal runs despite ongoing challenges with onboard power management and pet accommodation.

Watch on YouTube

More from Project Brupeg

What caused the steering to fail - Project Brupeg Ep.463Oct 2026CHAOS! & our first Night Time Trailer Haul Out - Project Brupeg Ep.462Sept 2026Look, It's possible we should have cleaned this before now... Project Brupeg Ep.461Sept 2026The Ridiculously Powerful Davit Winch - Project Brupeg Ep.460Sept 2026

From Project Brupeg — see the channel’s boat, crew, and every analysed video.

The Sailing Directory Newsletter

One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.

Report an issue