Sven Yrvindvideo
6 Aug 2025 Filling gaps with upside down boat
5 de agosto de 2025 · 2 min · 2K vistas
¿Qué cubre este video?
Sven Yrvind modifies the attachment points for hardware on his boat by relocating them to improve functionality.▶ 0:01 He identifies that previous mounting positions were too close to existing structures, necessitating a shift to new locations.▶ 0:13 For some fittings, he plans to use a string-based attachment system, while for others located in the bow, he will mount them directly to the side of the hull.▶ 0:18 To facilitate this work, he flips the boat upside down to gain better access for cleaning, grinding, and laminating the hull surface.▶ 1:01 These structural reinforcements are necessary to create strong points for the new hardware configuration. The process involves filling gaps in the hull and preparing the fiberglass surface for permanent installation.▶ 1:39 This preparation work is a necessary precursor to the final assembly of the boat's rigging and deck components.
Más de Sven Yrvind
De Sven Yrvind — ve el barco, la tripulación y cada video analizado del canal.
The Sailing Directory Newsletter
Un correo electrónico con los mejores hallazgos de la flota: los momentos, barcos e historias que valen tu tiempo de visualización. Ingresa tu propia dirección para obtener tu propia copia.



