MJ Sailingvideo
Winterizing Our Unfinished Boat (MJ Sailing - Ep 311)
25 de noviembre de 2023 · 20 min · 36K vistas · Kent Island
¿Qué cubre este video?
To maintain a workable temperature for boat construction during winter, the crew seals the cabin of their unfinished vessel using rigid insulation panels.0:07 They cut 8-foot sheets of insulation to fit the companionway and window openings, securing them with tape to create a thermal barrier within the tented workspace.2:17 To heat the interior, they utilize a portable diesel heater powered by a Jackery power station, which provides sufficient warmth for working with resins.11:18 Because polyester resins require consistent temperatures to cure properly, the crew stores their supplies in an insulated Igloo cooler equipped with a waterproof plant-rooting heating pad and a thermostat set to 70 degrees Fahrenheit.15:29 This setup ensures that materials remain at a stable, workable temperature regardless of the ambient cold. The crew also maintains a bulk supply of resins in a climate-controlled marina storage closet, swapping items into the cooler as needed.15:58
Más de MJ Sailing
De MJ Sailing — ve el barco, la tripulación y cada video analizado del canal.
The Sailing Directory Newsletter
Un correo electrónico con los mejores hallazgos de la flota: los momentos, barcos e historias que valen tu tiempo de visualización. Ingresa tu propia dirección para obtener tu propia copia.



