MJ Sailingvídeo

Winterizing Our Unfinished Boat (MJ Sailing - Ep 311)

25 de novembro de 2023 · 20 min · 36K visualizações · Kent Island

O que este vídeo aborda

To maintain a workable temperature for boat construction during winter, the crew seals the cabin of their unfinished vessel using rigid insulation panels.0:07 They cut 8-foot sheets of insulation to fit the companionway and window openings, securing them with tape to create a thermal barrier within the tented workspace.2:17 To heat the interior, they utilize a portable diesel heater powered by a Jackery power station, which provides sufficient warmth for working with resins.11:18 Because polyester resins require consistent temperatures to cure properly, the crew stores their supplies in an insulated Igloo cooler equipped with a waterproof plant-rooting heating pad and a thermostat set to 70 degrees Fahrenheit.15:29 This setup ensures that materials remain at a stable, workable temperature regardless of the ambient cold. The crew also maintains a bulk supply of resins in a climate-controlled marina storage closet, swapping items into the cooler as needed.15:58

Assistir no YouTube

Mais de MJ Sailing

The Ultimate Off-Grid Upgrade: Unboxing 8 Lithium Batteries!out. de 2026How Can a Light Switch Be SO COMPLICATED??!! (MJ Sailing - Episode 381)ago. de 2026Painting the Accent Walls On Our Home Built Catamaran (MJ Sailing - Episode 380)jul. de 2026The Details That Keep a Boat Dry (MJ Sailing - Episode 379)jun. de 2026

De MJ Sailing — veja o barco, a tripulação e cada vídeo analisado do canal.

The Sailing Directory Newsletter

Um e-mail com os melhores achados da frota — os momentos, barcos e histórias que valem o seu tempo de visualização. Insira seu endereço para receber sua própria cópia.

Reportar um problema