Project Brupegvideo

Below the Waterline Cabin Interior & Stopping Condensation - Project Brupeg Ep.414

13 de agosto de 2025 · 31 min · 22K vistas

¿Qué cubre este video?

The crew of the former fishing trawler Brupeg constructs a cabin interior within the vessel’s former freezer room, located below the waterline.5:19 To prevent condensation from accumulating against the steel hull and causing rust, they install a series of white spacer blocks to create a one-inch air gap between the steel and the interior wall panels.13:33 They secure these blocks using epoxy-based adhesive after polyurethane and silicone alternatives failed to set.16:28 The team uses 4mm plywood panels for the walls, mounting them to timber frames bolted to existing steel ribs and welded tags.6:20 They seal all timber edges with Jodomastic 90 epoxy to prevent moisture absorption.10:03 Separately, the crew addresses severe corrosion and multiple pinhole leaks in the aluminum hull of their tender dinghy.2:43 After discovering the bottom plating is compromised, they consult a local welder who recommends installing an aluminum doubler plate over the pitted sections rather than attempting to cut out and replace the degraded material.24:40

Ver en YouTube

Más de Project Brupeg

What caused the steering to fail - Project Brupeg Ep.463oct 2026CHAOS! & our first Night Time Trailer Haul Out - Project Brupeg Ep.462sep 2026Look, It's possible we should have cleaned this before now... Project Brupeg Ep.461sep 2026The Ridiculously Powerful Davit Winch - Project Brupeg Ep.460sep 2026

De Project Brupeg — ve el barco, la tripulación y cada video analizado del canal.

The Sailing Directory Newsletter

Un correo electrónico con los mejores hallazgos de la flota: los momentos, barcos e historias que valen tu tiempo de visualización. Ingresa tu propia dirección para obtener tu propia copia.

Reportar un problema