Project Brupegvideo

Below the Waterline Cabin Interior & Stopping Condensation - Project Brupeg Ep.414

August 13, 2025 · 31 min · 22K views

What this video covers

The crew of the former fishing trawler Brupeg constructs a cabin interior within the vessel’s former freezer room, located below the waterline.5:19 To prevent condensation from accumulating against the steel hull and causing rust, they install a series of white spacer blocks to create a one-inch air gap between the steel and the interior wall panels.13:33 They secure these blocks using epoxy-based adhesive after polyurethane and silicone alternatives failed to set.16:28 The team uses 4mm plywood panels for the walls, mounting them to timber frames bolted to existing steel ribs and welded tags.6:20 They seal all timber edges with Jodomastic 90 epoxy to prevent moisture absorption.10:03 Separately, the crew addresses severe corrosion and multiple pinhole leaks in the aluminum hull of their tender dinghy.2:43 After discovering the bottom plating is compromised, they consult a local welder who recommends installing an aluminum doubler plate over the pitted sections rather than attempting to cut out and replace the degraded material.24:40

Watch on YouTube

More from Project Brupeg

What caused the steering to fail - Project Brupeg Ep.463Oct 2026CHAOS! & our first Night Time Trailer Haul Out - Project Brupeg Ep.462Sep 2026Look, It's possible we should have cleaned this before now... Project Brupeg Ep.461Sep 2026The Ridiculously Powerful Davit Winch - Project Brupeg Ep.460Sep 2026

From Project Brupeg — see the channel’s boat, crew, and every analyzed video.

The Sailing Directory Newsletter

One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.

Report an issue