Living For Sailvideo
BACK TO WORK! - Rebuilt FLOODED Workshop | E026
8 de julio de 2024 · 20 min · 8K vistas
¿Qué cubre este video?
After a burst pipe caused extensive water damage to his workshop, Jon rebuilt the space to improve insulation, layout, and organization for the ongoing restoration of his boat, Antidote.0:13 He removed an auxiliary bathroom to increase floor space, relocated the attic access, and installed new insulation throughout the walls and ceiling.3:01 To finish the concrete floor, he ground the surface using a DeWalt DWE402N angle grinder equipped with a dust hood and applied a roll-on epoxy coating.5:01 He organized the shop using Swag Off-Road tool mounts and Bolt Depot hardware storage systems.9:15 The project concluded with the installation of a ground tarp in the adjacent boat shed to mitigate humidity and heat caused by groundwater evaporation.15:26 Rebuilding the workshop provided a more efficient, climate-controlled environment for future boat maintenance.
Barcos en este video
Más de Living For Sail
De Living For Sail — ve el barco, la tripulación y cada video analizado del canal.
The Sailing Directory Newsletter
Un correo electrónico con los mejores hallazgos de la flota: los momentos, barcos e historias que valen tu tiempo de visualización. Ingresa tu propia dirección para obtener tu propia copia.



