Living For Sailvídeo

BACK TO WORK! - Rebuilt FLOODED Workshop | E026

8 de julho de 2024 · 20 min · 8K visualizações

O que este vídeo aborda

After a burst pipe caused extensive water damage to his workshop, Jon rebuilt the space to improve insulation, layout, and organization for the ongoing restoration of his boat, Antidote.0:13 He removed an auxiliary bathroom to increase floor space, relocated the attic access, and installed new insulation throughout the walls and ceiling.3:01 To finish the concrete floor, he ground the surface using a DeWalt DWE402N angle grinder equipped with a dust hood and applied a roll-on epoxy coating.5:01 He organized the shop using Swag Off-Road tool mounts and Bolt Depot hardware storage systems.9:15 The project concluded with the installation of a ground tarp in the adjacent boat shed to mitigate humidity and heat caused by groundwater evaporation.15:26 Rebuilding the workshop provided a more efficient, climate-controlled environment for future boat maintenance.

Assistir no YouTube

Barcos neste vídeo

Liberty 458O barco deles

Mais de Living For Sail

This Was Inside The Boat!? — Should I Put It Back?set. de 2026BACK to Work on ANTIDOTE! - How I Used 3D Printing to Fix My Boatago. de 2026⛵️ I Tried Boiling Water Out of My Boat... It Actually Worked - sort of?!jul. de 2026⛵️ This DIY Sailboat Repair Has To Work... Right?jun. de 2026

De Living For Sail — veja o barco, a tripulação e cada vídeo analisado do canal.

The Sailing Directory Newsletter

Um e-mail com os melhores achados da frota — os momentos, barcos e histórias que valem o seu tempo de visualização. Insira seu endereço para receber sua própria cópia.

Reportar um problema