sailing.directory
CanalesBarcosPreguntaAcerca de
🇲🇽
🇺🇸English🇬🇧English (UK)🇲🇽Español (México)🇪🇸Español (España)🇫🇷Français🇮🇹Italiano🇵🇹Português (Portugal)🇧🇷Português (Brasil)🇬🇷Ελληνικά🇳🇴Norsk
Iniciar sesión
sailing.directory

Un índice de los canales de vela en YouTube — con búsqueda por tema y navegación por interés. Canales y barcos nuevos, indexados cada semana. Sin ruido.

Explorar

CanalesBarcosBuscarAcerca deSugerir un canal

Creadores y legal

ApóyanosPara creadoresPrivacidadTérminosDMCA

No es asesoramiento de navegación · © 2026

InicioCanalesBarcos

Más

BuscarPreguntaAcerca deApóyanosPara creadoresIniciar sesión

Idioma

🇺🇸English🇬🇧English (UK)🇲🇽Español (México)🇪🇸Español (España)🇫🇷Français🇮🇹Italiano🇵🇹Português (Portugal)🇧🇷Português (Brasil)🇬🇷Ελληνικά🇳🇴Norsk

Modo de pantalla

sailing.directory
CanalesBarcosPreguntaAcerca de
🇲🇽
🇺🇸English🇬🇧English (UK)🇲🇽Español (México)🇪🇸Español (España)🇫🇷Français🇮🇹Italiano🇵🇹Português (Portugal)🇧🇷Português (Brasil)🇬🇷Ελληνικά🇳🇴Norsk
Iniciar sesión

Sailing Zatara · video

Our Barndominium ARRIVED! (This looks like A LOT of work!) 🤯 Ep 337

2 de octubre de 2025 · 14 min · 107K vistas · Judith Basin County, United States

Worker surveys vast concrete foundation at remote construction site.

Ver en YouTube

¿Qué cubre este video?

Keith and Renee Whitaker are preparing to erect a steel barndominium on their property, following the completion of an 80-by-120-foot mono slab foundation. A to Z Concrete spent over a month grading gravel, tying rebar, and pouring the two-foot-thick edge slab.▶ 4:44 To prevent random structural failure, the crew installed relief cuts, which encourage concrete to crack in controlled, predetermined lines.▶ 5:23 Despite these measures, a minor surface crack appeared, which the contractors plan to seal with a specialized powder.▶ 6:01 To accommodate the delivery of the steel building components, Keith cleared brush, leveled the road, and removed a section of fencing to allow semi-trucks to navigate the site.▶ 0:27 The delivery arrived via three separate trucks, requiring the crew to inventory and stage the steel beams, girts, purlins, and hardware.▶ 9:42 The construction plan involves building from the back of the structure toward the front to minimize material handling.▶ 11:29 Future site work includes finishing the water line trenching and installing a septic system before the vertical assembly begins.▶ 11:23

Más de Sailing Zatara

No car... No Costco... No Problem!jul 2026WE DID IT! We Crossed The Pacific Ocean! 🌊jun 2026How We Survive Offshore: Power⚡️ and Water 💦jun 2026HECTIC!! Fighting Sails & Dodging Night Squalls 🌊jun 2026

De Sailing Zatara — ve el barco, la tripulación y cada video analizado del canal.

Reportar un problema
InicioCanalesBarcos

Más

BuscarPreguntaAcerca deApóyanosPara creadoresIniciar sesión

Idioma

🇺🇸English🇬🇧English (UK)🇲🇽Español (México)🇪🇸Español (España)🇫🇷Français🇮🇹Italiano🇵🇹Português (Portugal)🇧🇷Português (Brasil)🇬🇷Ελληνικά🇳🇴Norsk

Modo de pantalla

sailing.directory

Un índice de los canales de vela en YouTube — con búsqueda por tema y navegación por interés. Canales y barcos nuevos, indexados cada semana. Sin ruido.

Explorar

CanalesBarcosBuscarAcerca deSugerir un canal

Creadores y legal

ApóyanosPara creadoresPrivacidadTérminosDMCA

No es asesoramiento de navegación · © 2026