sailing.directory
ChannelsBoatsAskAbout
🇺🇸
🇺🇸English🇬🇧English (UK)🇲🇽Español (México)🇪🇸Español (España)🇫🇷Français🇮🇹Italiano🇵🇹Português (Portugal)🇧🇷Português (Brasil)🇬🇷Ελληνικά🇳🇴Norsk
Sign in
sailing.directory

An index of sailing channels on YouTube — searchable by topic, navigable by interest. New channels and boats, indexed weekly. No noise.

Explore

ChannelsBoatsSearchAboutSuggest a channel

Creators & legal

SupportFor creatorsPrivacyTermsDMCA

Not navigation advice · © 2026

HomeChannelsBoats

More

SearchAskAboutSupportFor creatorsSign in

Language

🇺🇸English🇬🇧English (UK)🇲🇽Español (México)🇪🇸Español (España)🇫🇷Français🇮🇹Italiano🇵🇹Português (Portugal)🇧🇷Português (Brasil)🇬🇷Ελληνικά🇳🇴Norsk

Display mode

sailing.directory
ChannelsBoatsAskAbout
🇺🇸
🇺🇸English🇬🇧English (UK)🇲🇽Español (México)🇪🇸Español (España)🇫🇷Français🇮🇹Italiano🇵🇹Português (Portugal)🇧🇷Português (Brasil)🇬🇷Ελληνικά🇳🇴Norsk
Sign in

Sailing Zatara · video

Our Barndominium ARRIVED! (This looks like A LOT of work!) 🤯 Ep 337

October 2, 2025 · 14 min · 107K views · Judith Basin County, United States

Worker surveys vast concrete foundation at remote construction site.

Watch on YouTube

What this video covers

Keith and Renee Whitaker are preparing to erect a steel barndominium on their property, following the completion of an 80-by-120-foot mono slab foundation. A to Z Concrete spent over a month grading gravel, tying rebar, and pouring the two-foot-thick edge slab.▶ 4:44 To prevent random structural failure, the crew installed relief cuts, which encourage concrete to crack in controlled, predetermined lines.▶ 5:23 Despite these measures, a minor surface crack appeared, which the contractors plan to seal with a specialized powder.▶ 6:01 To accommodate the delivery of the steel building components, Keith cleared brush, leveled the road, and removed a section of fencing to allow semi-trucks to navigate the site.▶ 0:27 The delivery arrived via three separate trucks, requiring the crew to inventory and stage the steel beams, girts, purlins, and hardware.▶ 9:42 The construction plan involves building from the back of the structure toward the front to minimize material handling.▶ 11:29 Future site work includes finishing the water line trenching and installing a septic system before the vertical assembly begins.▶ 11:23

More from Sailing Zatara

No car... No Costco... No Problem!Jul 2026WE DID IT! We Crossed The Pacific Ocean! 🌊Jun 2026How We Survive Offshore: Power⚡️ and Water 💦Jun 2026HECTIC!! Fighting Sails & Dodging Night Squalls 🌊Jun 2026

From Sailing Zatara — see the channel’s boat, crew, and every analyzed video.

Report an issue
HomeChannelsBoats

More

SearchAskAboutSupportFor creatorsSign in

Language

🇺🇸English🇬🇧English (UK)🇲🇽Español (México)🇪🇸Español (España)🇫🇷Français🇮🇹Italiano🇵🇹Português (Portugal)🇧🇷Português (Brasil)🇬🇷Ελληνικά🇳🇴Norsk

Display mode

sailing.directory

An index of sailing channels on YouTube — searchable by topic, navigable by interest. New channels and boats, indexed weekly. No noise.

Explore

ChannelsBoatsSearchAboutSuggest a channel

Creators & legal

SupportFor creatorsPrivacyTermsDMCA

Not navigation advice · © 2026