sailing.directory
CanalesBarcosPreguntaAcerca de
🇲🇽
🇺🇸English🇬🇧English (UK)🇲🇽Español (México)🇪🇸Español (España)🇫🇷Français🇮🇹Italiano🇵🇹Português (Portugal)🇧🇷Português (Brasil)🇬🇷Ελληνικά🇳🇴Norsk
Iniciar sesión
sailing.directory

Un índice de los canales de vela en YouTube — con búsqueda por tema y navegación por interés. Canales y barcos nuevos, indexados cada semana. Sin ruido.

Explorar

CanalesBarcosBuscarAcerca deSugerir un canal

Creadores y legal

ApóyanosPara creadoresPrivacidadTérminosDMCA

No es asesoramiento de navegación · © 2026

InicioCanalesBarcos

Más

BuscarPreguntaAcerca deApóyanosPara creadoresIniciar sesión

Idioma

🇺🇸English🇬🇧English (UK)🇲🇽Español (México)🇪🇸Español (España)🇫🇷Français🇮🇹Italiano🇵🇹Português (Portugal)🇧🇷Português (Brasil)🇬🇷Ελληνικά🇳🇴Norsk

Modo de pantalla

sailing.directory
CanalesBarcosPreguntaAcerca de
🇲🇽
🇺🇸English🇬🇧English (UK)🇲🇽Español (México)🇪🇸Español (España)🇫🇷Français🇮🇹Italiano🇵🇹Português (Portugal)🇧🇷Português (Brasil)🇬🇷Ελληνικά🇳🇴Norsk
Iniciar sesión

Sailing Uma · video

Making Space For More Batteries | Step 460

19 de octubre de 2025 · 31 min · 133K vistas

Kika paints names inside cramped boat locker, smiling.

Ver en YouTube

¿Qué cubre este video?

Dan and Kika replace Uma's cockpit drains and build a battery box in the cockpit locker as part of a larger electrical system overhaul. The old cockpit drains — 1.5-inch tubes routed through seacocks — are ground out and replaced with fiberglass stern-tube stock, chosen because it is stronger than hand-laminated tube without vacuum bagging or autoclaving.▶ 8:37 The new tubes are roughly double the diameter, giving approximately four times the flow area and eliminating the through-hull restriction; Dan estimates the cockpit will drain four to five times faster.▶ 3:44 The drain replacement was motivated by a rat that chewed through the original through-hull fitting while the boat was in Florida, nearly sinking Uma.▶ 1:52 With the drains glassed in and cured, Dan builds a plywood battery box — primed, painted, and assembled outside the locker before installation — to hold five of the planned ten lithium batteries elevated above the hull and above the waterline.▶ 13:16 The second bank of five goes under the companionway steps, separated by a watertight bulkhead, giving two independent Ocean Volts battery banks each with its own BMS.▶ 1:06 Kika spends four hours writing patron names inside the locker before sealing them under a final paint coat.▶ 19:49 Cockpit lid reinforcement and waterproofing, started in Guatemala in 2017, is deferred to the next episode.▶ 29:24

Más de Sailing Uma

Uma is Ready to Launch! (But there's a catch) | Step 489jun 2026How Many Sails Does it Take To Replace a Diesel Engine? | Step 488may 2026Turning Our Powerboat Back Into a Sailboat | Step 487may 2026We Cut our Mast in Half | Step 486may 2026

De Sailing Uma — ve el barco, la tripulación y cada video analizado del canal.

Reportar un problema
InicioCanalesBarcos

Más

BuscarPreguntaAcerca deApóyanosPara creadoresIniciar sesión

Idioma

🇺🇸English🇬🇧English (UK)🇲🇽Español (México)🇪🇸Español (España)🇫🇷Français🇮🇹Italiano🇵🇹Português (Portugal)🇧🇷Português (Brasil)🇬🇷Ελληνικά🇳🇴Norsk

Modo de pantalla

sailing.directory

Un índice de los canales de vela en YouTube — con búsqueda por tema y navegación por interés. Canales y barcos nuevos, indexados cada semana. Sin ruido.

Explorar

CanalesBarcosBuscarAcerca deSugerir un canal

Creadores y legal

ApóyanosPara creadoresPrivacidadTérminosDMCA

No es asesoramiento de navegación · © 2026