Sailing Supernovavidéo
GETTING READY FOR OUR 1100 MILE SAIL TO PANAMA [Ep. 38]
19 avril 2024 · 24 min · 10K vues
Ce que couvre cette vidéo
The crew of the 40-ft catamaran Supernova performs a series of maintenance tasks while docked in preparation for an 1,100-mile passage to Panama. They mark the anchor chain with spray paint at 50-foot intervals, using white, red-and-white, and solid red patterns to indicate depth and prevent accidental loss of the anchor.2:38 To improve safety during night watches, they install jack lines along the deck, securing them to the hardtop to avoid the risks associated with clipping into lifelines.6:47 The crew also increases galley storage by bolting plastic baskets to locker lids after failing to secure them with heavy-duty adhesive velcro.12:52 Additional preparations include replacing a sink through-hull fitting using marine sealant and applying resin to fiberglass surfaces under the galley sink and washing machine to prevent water damage.17:29 The crew monitors weather forecasts to avoid the high-wind Papagayo winds during their upcoming transit.23:27 Proper preparation of gear and storage systems significantly improves boat organization and safety for offshore passages.
Plus de vidéos de Sailing Supernova
De Sailing Supernova — voir le bateau, l'équipage et chaque vidéo analysée de la chaîne.
The Sailing Directory Newsletter
Un e-mail avec les meilleures trouvailles de la flotte — les moments, les bateaux et les histoires qui valent la peine d'être regardés. Entrez votre adresse pour recevoir votre propre exemplaire.



