Project Brupegvidéo

Creating a Marine Diesel Day Tank - Project Brupeg Ep.394

3 mars 2025 · 38 min · 22K vues · Gladstone Basin

Ce que couvre cette vidéo

Damien and Pat modify the engine room of the steel-hulled tug *Salonica* to install a new day tank for the Cummins 855 engine.0:52 They repurpose an existing center tank, approximately 1,000 liters in capacity, by welding in new stainless steel fuel pickups, water drains, and sight glasses.1:53 Using a Unimig lift TIG welder, they install two pickups: one extending to the bottom for water drainage and a shorter one for fuel to prevent the engine from drawing water or air.4:18 Obstructions behind the bulkhead, including cement-filled bollard pipes, force a relocation of the fuel return line to the top of the tank.10:16 The project also involves converting two seawater ballast tanks into freshwater storage, requiring the crew to drain the tanks, pressure wash internal sediment, and repaint the piping to match international color codes.14:23 A gas leak in the welder briefly halts progress, requiring a teardown and inspection of the internal lines.12:48 Proper tank design for marine engines requires separate, height-staggered pickups to effectively isolate fuel from water and sediment.21:56

Regarder sur YouTube

Plus de vidéos de Project Brupeg

What caused the steering to fail - Project Brupeg Ep.463oct. 2026CHAOS! & our first Night Time Trailer Haul Out - Project Brupeg Ep.462sept. 2026Look, It's possible we should have cleaned this before now... Project Brupeg Ep.461sept. 2026The Ridiculously Powerful Davit Winch - Project Brupeg Ep.460sept. 2026

De Project Brupeg — voir le bateau, l'équipage et chaque vidéo analysée de la chaîne.

The Sailing Directory Newsletter

Un e-mail avec les meilleures trouvailles de la flotte — les moments, les bateaux et les histoires qui valent la peine d'être regardés. Entrez votre adresse pour recevoir votre propre exemplaire.

Signaler un problème