Salt & Tarvidéo

Salt & Tar: Ep.300- Let's Get Sticky!

22 août 2024 · 19 min · 33K vues · Mexico

Ce que couvre cette vidéo

Garrett constructs five frames for a 10-foot stitch-and-glue dinghy using a multi-layer lamination process.4:06 Each frame consists of three layers of plywood, which he bonds using epoxy in two separate stages to manage the curing time and ensure alignment.0:29 To maintain precision during the glue-up, he drives small nails through the layers to act as locating pins, ensuring the pieces seat correctly when reassembled.1:42 He secures the frames to his workbench using custom-made plywood clamps and screws, avoiding the need for heavy weights.7:22 After the epoxy cures, he removes the clamps, cleans the excess runoff, and uses a router to round the edges of the frames before applying a final protective coat of epoxy.13:44 This preparation allows him to finish the components before installing them into the hull structure.14:00 The project serves as a summer build to provide a lightweight, durable tender for a cruising boat.3:40

Regarder sur YouTube

Plus de vidéos de Salt & Tar

Meet Victoria - Tour of our William Garden 'Porpoise' built by Robin Fung in 1975oct. 2026Salt & Tar: Ep.360- Good Newsoct. 2026Salt & Tar: Ep.359- Memory Lanesept. 2026Salt & Tar: Ep.358- Sad Newssept. 2026

De Salt & Tar — voir le bateau, l'équipage et chaque vidéo analysée de la chaîne.

The Sailing Directory Newsletter

Un e-mail avec les meilleures trouvailles de la flotte — les moments, les bateaux et les histoires qui valent la peine d'être regardés. Entrez votre adresse pour recevoir votre propre exemplaire.

Signaler un problème