Sailing Triteiavidéo
NEW RUDDER COMPLETE!!! Installing The Rudder on my 1965 Alberg 30 Sloop
22 mai 2026 · 27 min · 18K vues · Thailand
Old and new rudders stand side by side at boatyard.
Ce que couvre cette vidéo
James builds a replacement rudder from scratch for Triteia, his 1965 Alberg 30, while hauled out in Thailand during a mid-circumnavigation refit.0:16 The original all-wood rudder broke free from the tiller post in August 2021 after striking a partially submerged shipping container while sailing between Los Angeles and Hawaii, forcing him to steer 1,000 miles to Hawaii using a drogue.0:59 Bronze tangs were welded to the tiller shaft in Hawaii as a temporary fix; the decision to build a full replacement came during a haul-out in Langkawi, Malaysia.1:17
The build uses thickened epoxy with fast-setting hardener for sculptural shaping and gap-filling, six-ounce fiberglass cloth taped over all edges, and a final solid glass sheet over the whole blade.1:45 Barrier coat additive goes into all final epoxy layers to block moisture.4:26 Packaging tape serves as a release agent when bedding the tiller post interface in place on the boat, producing a precise fit.2:28 Nylon spacers control vertical play at the shoe mount; Sikaflex with nylon lock nuts and lock washers beds the bronze hardware.22:21 The complete project took six and a half weeks.26:41 Stainless steel fittings were supplied by Raleigh Tasker in Thailand, described as a one-stop shop for sails, rigging, spars, and stainless fabrication.26:58 The next project is a Beta Marine engine installation.0:23
Bateaux dans cette vidéo
Plus de vidéos de Sailing Triteia
De Sailing Triteia — voir le bateau, l'équipage et chaque vidéo analysée de la chaîne.
The Sailing Directory Newsletter
Un e-mail avec les meilleures trouvailles de la flotte — les moments, les bateaux et les histoires qui valent la peine d'être regardés. Entrez votre adresse pour recevoir votre propre exemplaire.



