RAN Sailingvidéo
We Finished Planking The Hull! - Ep. 363 RAN Sailing
8 septembre 2023 · 23 min · 131K vues · Skåne
Ce que couvre cette vidéo
Johan and Malin complete the hull planking of their 50-foot custom sailboat, a project that spanned over four months of construction on their farm.20:10 Johan transitions from Canadian cedar to 50 mm-wide Swedish cedar strips to finish the bottom of the hull, noting that the wider material accelerates progress on the flatter sections.2:40 To prepare for the final center-line cut, Johan switches to a metal-cutting blade on his plunge saw to avoid damaging the tool on hidden, hardened screws used to secure the strips.8:43 He describes the physical toll of the process, which involves hours of crawling across the hull, and details the final push that required 19-hour workdays to close the bow and keel recess area.19:44 The couple celebrates the completion of the hull by installing the final "whiskey plank," a traditional milestone in wooden boat building.21:42 They plan to begin the fiberglass lamination phase by late November to maintain their one-year construction schedule for the hull.21:21
Plus de vidéos de RAN Sailing
De RAN Sailing — voir le bateau, l'équipage et chaque vidéo analysée de la chaîne.
The Sailing Directory Newsletter
Un e-mail avec les meilleures trouvailles de la flotte — les moments, les bateaux et les histoires qui valent la peine d'être regardés. Entrez votre adresse pour recevoir votre propre exemplaire.



