Sailing SV Cordeliavidéo
10 Months in BOAT REFIT. Now THIS! | Sailing Belize
29 mai 2026 · 12 min · 2K vues · Belize
Sailboat cuts through turquoise sea under bright sky
Ce que couvre cette vidéo
Steve and Annette depart Livingston, Guatemala, on a 1.5–2 hour motor passage to Punta Gorda, Belize, for check-in during a mid-refit break aboard their Venus ketch Cordelia.1:05 Just before leaving Livingston, all cockpit instruments go dead — the depth sounder, critical for entering an unfamiliar reef area, among them.3:40 The fault traces to a loose NMEA connector on the chart-table cabling, dislodged during sanding work; reconnecting it restores the instruments before the reef approach.3:45 Punta Gorda check-in takes roughly an hour.2:18 The crew does not stay overnight there because a persistent offshore wind makes it a lee shore; they move on to Frenchman's Cay, a mangrove anchorage about 1.5 hours up the coast.2:30 From there they transit roughly seven hours to Placencia, motoring at 4–4.5 knots.7:33 In Placencia they provision: vegetables, eggs, ham, corned beef, and bread cost £40 sterling — noticeably more than Guatemala prices.10:52 Belize has the world's second-largest reef system; the crew plans snorkeling at the cayes.0:40 The passage is a two-month break before returning to phase two of the refit.0:10 A loose multi-way NMEA connector, easily overlooked after disassembly work, can silence all cockpit instruments at the worst possible moment.
Plus de vidéos de Sailing SV Cordelia
De Sailing SV Cordelia — voir le bateau, l'équipage et chaque vidéo analysée de la chaîne.
The Sailing Directory Newsletter
Un e-mail avec les meilleures trouvailles de la flotte — les moments, les bateaux et les histoires qui valent la peine d'être regardés. Entrez votre adresse pour recevoir votre propre exemplaire.



