Sailing Spyvidéo
Hard Days In The Boatyard - Splashing Spy!
20 février 2024 · 19 min · 3K vues · Puerto Peñasco
Ce que couvre cette vidéo
After four months in a Puerto Pinasco boatyard, the crew of the sailboat Spy relocated their refrigerator to the former icebox location to improve life raft accessibility.1:10 The project involved removing heavy insulation and paneling, installing neoprene hull liner, and custom-fitting a plywood floor for the Dometic fridge.5:58 During the final days of yard work, the crew battled extreme heat, food poisoning, and the pressure of a looming splash date.8:26 Upon launching, the engine failed immediately due to a leaking fuel-water separator gasket, forcing the crew to maneuver the boat into a nearby slip under wind power alone.12:34 The owner repaired the fuel system by locating a spare gasket in his spares kit after an initial failed attempt with O-rings and screws.14:42 Following a night at the private dock, the crew provisioned for a 70-mile passage south, departing just before an incoming gale.17:29 Proper fuel system maintenance and spare parts inventory are critical for immediate post-launch reliability.
Bateaux dans cette vidéo
Plus de vidéos de Sailing Spy
De Sailing Spy — voir le bateau, l'équipage et chaque vidéo analysée de la chaîne.
The Sailing Directory Newsletter
Un e-mail avec les meilleures trouvailles de la flotte — les moments, les bateaux et les histoires qui valent la peine d'être regardés. Entrez votre adresse pour recevoir votre propre exemplaire.



