Windy_Wayravidéo

INVERTER Installed, RUDDER removed | Restoring WAYRA | Ep 7

7 novembre 2021 · 7 min · 4K vues · Greek Islands

Ce que couvre cette vidéo

Alex and Daniela perform maintenance on their boat, WAYRA, during a nine-day work period in Greece.2:25 Alex installs an inverter-charger, which automatically switches between 12-volt battery power and 220-volt shore power.1:49 He maps existing electrical wiring while integrating the new unit.2:02 Meanwhile, the crew attempts to repair the rudder without removing it entirely, though they eventually disassemble components to assess the necessary repairs.2:50 They also troubleshoot non-functional stern navigation lights, discovering a beehive inside the switch housing.4:41 The work concludes with the crew cleaning the hull and identifying required spare parts for future installation.6:44 They plan to return to the boat by late September or early October to continue the restoration, which includes sanding the entire hull.2:41 The project remains in the assessment and disassembly phase, with the crew prioritizing the procurement of replacement parts before reassembly begins.6:22

Regarder sur YouTube

Bateaux dans cette vidéo

Amel Maramu 46Leur bateau

Plus de vidéos de Windy_Wayra

Welding, angle grinders, and lots of sweat: This is how we made our SOLAR ARCH in Greece | Windy W...juin 2026DAY 1 OF THE REFIT IN GREECE ⏳ WILL WE MAKE IT IN 3 MONTHS? | Windy Wayra Ep 70mai 2026OUR WAYRA WISHLIST: MADNESS OR NECESSITY? | Windy Wayra Ep 70avr. 2026WE VISIT WAYRA, AN INTERNAL DISASTER... ☞ | Windy Wayra Ep 69mars 2026

De Windy_Wayra — voir le bateau, l'équipage et chaque vidéo analysée de la chaîne.

The Sailing Directory Newsletter

Un e-mail avec les meilleures trouvailles de la flotte — les moments, les bateaux et les histoires qui valent la peine d'être regardés. Entrez votre adresse pour recevoir votre propre exemplaire.

Signaler un problème