Wind Hippie Sailingvidéo
No Days Wasted WHSE165
7 juillet 2025 · 26 min · 22K vues · Australia
Ce que couvre cette vidéo
Holly and Dan prepare their 38-ft sailboat, *Gekko*, for a passage from Darwin, Australia, to Indonesia by performing maintenance and organizing customs documentation. Holly replaces the UV-damaged lines on the wind vane, using a rolling hitch and electrical tape to pull new line through the housing.0:06 Dan repairs a leaking soft-bag water tank in the quarter berth using silicone sealant and tape.3:33 To prepare for Indonesian customs, the crew audits their medical supplies, discarding expired items to comply with entry requirements, and compiles an inventory of food and alcohol.9:08 The crew also modifies a hand-cranked coffee grinder into a drill-powered unit and patches bicycle inner tubes.6:09 Before departing, they dock at Tipperary Bay Marina to test a newly installed Rolly Tasker furling headsail, navigating the narrow, dredged river channel and the marina’s lock system, which manages Darwin’s 20-foot tides.10:15 They conclude their stay by dining at Frying Nemo, a local restaurant specializing in wild-caught fish and crocodile burgers.13:03 Meticulous inventory management and over-preparing documentation simplify the customs clearance process for international arrivals.
Plus de vidéos de Wind Hippie Sailing
De Wind Hippie Sailing — voir le bateau, l'équipage et chaque vidéo analysée de la chaîne.
The Sailing Directory Newsletter
Un e-mail avec les meilleures trouvailles de la flotte — les moments, les bateaux et les histoires qui valent la peine d'être regardés. Entrez votre adresse pour recevoir votre propre exemplaire.



