Vagabond Voyagesvidéo

The country is paralyzed... We need patience! Ep.13

5 novembre 2023 · 19 min · 6K vues · Panama

Ce que couvre cette vidéo

Panama’s nationwide protests and road blockades have stalled preparations for a planned transit of the Panama Canal.0:52 The crew faces significant logistical hurdles, including difficulty sourcing food and fuel, and the inability to pay canal transit fees via credit card.1:59 Because the local bank in Colon requires cash payments for those without a shipping agent, the crew remains in a holding pattern while attempting to secure a transit date for mid-January.6:44

Beyond transit logistics, the crew continues maintenance on their vessel. Projects include replacing a 45-year-old faucet, installing two cooling fans to prevent the refrigerator compressor from overheating, and upgrading the house battery bank to four gel batteries totaling 300 Ah.10:30 They also repaired a section of rotted wood in the cabin and patched leaks in their inflatable paddleboards.9:38 During a marina stay, the crew successfully retrieved a dropped water filter from the seabed to ensure clean tank water.13:48 Despite the travel restrictions, the crew explores the local landscape on horseback.15:30

Regarder sur YouTube

Plus de vidéos de Vagabond Voyages

What to bring when visiting the islands of Vanuatu? vlog 133août 2026A mission that gives the journey its true meaning. Vlog 134août 2026After a rough night, one click... and it all disappears.juil. 2026Withdrawing money in Vanuatu… I was genuinely terrified! | Vlog 132juil. 2026

De Vagabond Voyages — voir le bateau, l'équipage et chaque vidéo analysée de la chaîne.

The Sailing Directory Newsletter

Un e-mail avec les meilleures trouvailles de la flotte — les moments, les bateaux et les histoires qui valent la peine d'être regardés. Entrez votre adresse pour recevoir votre propre exemplaire.

Signaler un problème