Project Brupegvidéo

Melted Cables & Preparing for Sea Trials - Project Brupeg Ep.378

23 octobre 2024 · 42 min · 27K vues · Bundaberg

Ce que couvre cette vidéo

The crew of the 10-year rebuild project *Brupeg* prepares the vessel for a 13-hour, 80-mile sea trial from Bundaberg to Gladstone, Australia.0:16 To ensure reliability for future coastal training with the Australian Navy Cadets, the team overhauls the electrical system after discovering melted wiring caused by a ground fault.14:50 The failure occurred when an oil sensor malfunctioned, grounding the engine and forcing starter current through thin sensor cables.15:01 The team replaces the damaged wiring with a robust loom, installs positive and negative fuses on all lines, and upgrades to more durable sensors.15:07 They also remove redundant analog gauges in favor of a digital monitoring system and integrate a Victron power setup.12:09 The engine room modifications include installing waterproof, resin-sealed plugs and hard conduit for cable protection.22:08 The crew also tests the alternator’s thermal performance under load and verifies fuel pressure monitoring systems.26:17 These electrical and sensor upgrades prevent future ground-path failures and improve system monitoring reliability for long-distance passages.

Regarder sur YouTube

Plus de vidéos de Project Brupeg

What caused the steering to fail - Project Brupeg Ep.463oct. 2026CHAOS! & our first Night Time Trailer Haul Out - Project Brupeg Ep.462sept. 2026Look, It's possible we should have cleaned this before now... Project Brupeg Ep.461sept. 2026The Ridiculously Powerful Davit Winch - Project Brupeg Ep.460sept. 2026

De Project Brupeg — voir le bateau, l'équipage et chaque vidéo analysée de la chaîne.

The Sailing Directory Newsletter

Un e-mail avec les meilleures trouvailles de la flotte — les moments, les bateaux et les histoires qui valent la peine d'être regardés. Entrez votre adresse pour recevoir votre propre exemplaire.

Signaler un problème