45 Degrees Sailingvidéo
Single Line Mooring Vela Garška - Sharpen Up Episode 22
23 octobre 2025 · 7 min · 4K vues · Vela Garška, Hvar
Ce que couvre cette vidéo
Nick and his crew moor their yacht at Vela Garška, located off the island of Chwa near the Pakalini Islands, using a shore-based mooring line system.0:24 Because the restaurant that typically manages the mooring is closed for the season, the crew uses a dinghy to retrieve the shore line.0:35 The maneuver requires securing the line to the windward stern cleat to act as a control line while reversing toward the shore.2:24 Without a bow thruster, the crew uses the control line and prop walk to pivot the yacht into position.1:54 After securing the stern line, they drive the boat forward against the tension to bring the bow into alignment before backing down to finalize the mooring.5:42 When one line fails to hold, the crew adapts by using the remaining line to maintain position and distance from the rocks.4:12 Proper use of a stern control line allows a vessel to maneuver safely in tight quarters without a bow thruster.
Plus de vidéos de 45 Degrees Sailing
De 45 Degrees Sailing — voir le bateau, l'équipage et chaque vidéo analysée de la chaîne.
The Sailing Directory Newsletter
Un e-mail avec les meilleures trouvailles de la flotte — les moments, les bateaux et les histoires qui valent la peine d'être regardés. Entrez votre adresse pour recevoir votre propre exemplaire.



