YACHTING STEADFASTvidéo
PITCHING THE BILGE FINAL Interior view--sealing the pockets of a wooden boat rebuild with asphalt
14 août 2026 · 3 min · 2 vues
Ce que couvre cette vidéo
Steven Uhthoff pours hot asphalt into the bilge pockets of a wooden boat's bow during a full rebuild, sealing spaces that previously held Portland cement.Watch The work takes place in the forward section of the vessel, around a crash bulkhead, a new purpleheart stem, longleaf yellow pine planking repurposed from a Pennsylvania factory, and a large oak bit tied to the anchor retaining system.0:37 The asphalt is a number three low-odor roofing product, melted outside at roughly 400 degrees and poured in from the exterior so it flows into every crack and crevice.1:38 The crew monitors fill levels by watching the asphalt bubble and flow across the knees, calling a stop on the starboard side when it nears full.1:59 Portland cement had previously occupied these pockets but was rejected because it does not adhere to wood and seals poorly compared to asphalt.2:49 The asphalt is also noted as economical.2:58 The practical conclusion: for wooden boat bilge pockets, hot-poured roofing asphalt bonds and seals where Portland cement fails.
Plus de vidéos de YACHTING STEADFAST
De YACHTING STEADFAST — voir le bateau, l'équipage et chaque vidéo analysée de la chaîne.
The Sailing Directory Newsletter
Un e-mail avec les meilleures trouvailles de la flotte — les moments, les bateaux et les histoires qui valent la peine d'être regardés. Entrez votre adresse pour recevoir votre propre exemplaire.



