Au grès des voilesvidéo
End of our journey
18 décembre 2024 · 51 min · 3K vues · Raiatea
Ce que couvre cette vidéo
A crew sails from Raiatea, French Polynesia, to Vava'u, Tonga, and finally to Vuda Marina in Fiji to deliver a sailboat. The transit from French Polynesia to Tonga covers approximately 1,300 nautical miles, during which the crew experiences a genoa failure caused by a broken halyard attachment point and persistent issues with an in-mast furling mainsail.2:09 To avoid a depression moving from the south of Fiji, the crew maintains a target speed of 135 nautical miles per day.5:15 Upon arrival in Vava'u, the crew completes customs and immigration procedures before departing for a 540-nautical-mile passage to Fiji.22:12 The final leg involves navigating through reef-heavy waters to reach Vuda Marina, where the vessel enters a channel with a 2.4-meter depth at low tide.30:03 The marina utilizes a cyclone-protection technique where boats are placed in excavated pits with their keels buried in the ground.34:48 The crew concludes the delivery at Vuda Marina, where the vessel is prepared for long-term storage.50:48
Plus de vidéos de Au grès des voiles
De Au grès des voiles — voir le bateau, l'équipage et chaque vidéo analysée de la chaîne.
The Sailing Directory Newsletter
Un e-mail avec les meilleures trouvailles de la flotte — les moments, les bateaux et les histoires qui valent la peine d'être regardés. Entrez votre adresse pour recevoir votre propre exemplaire.



