Wildly Intrepid Sailingvidéo

Finally stepping the MAST [Wildly Intrepid Sailing Ep 51]

15 septembre 2019 · 18 min · 653 vues

Ce que couvre cette vidéo

The crew re-beds the jib tracks on their sailboat after discovering leaks and old silicone sealant.0:36 They remove the tracks, clean the surfaces, and reinstall them using butyl tape.3:03 To prepare for offshore sailing, they install a Y-valve in the waste system, allowing the toilet to discharge either into the holding tank or directly overboard.4:27 This installation requires rerouting hoses in a confined space, which they facilitate by slicing the old, stubborn hose ends to ease removal and applying marine grease to slide new connections into place.8:19 Finally, the crew steps the mast after a previous attempt was delayed by high winds.13:19 They tension the rigging, including the backstay, and reconnect the halyards and electrical wiring.15:29 A minor issue with a fouled topping lift requires a climb up the mast to clear the line from the shrouds.15:47 The boat is successfully re-rigged and ready for sailing.

Regarder sur YouTube

Plus de vidéos de Wildly Intrepid Sailing

WORTH NO SLEEP? Dominica's hidden gem E399sept. 2026We Got LOST in the Pirates of the Caribbean Indian River! E398sept. 2026ROUGH Sail to Dominica But it's WORTH IT E397sept. 2026Hidden Hot Springs & Sailing life of a family in Guadeloupe E396août 2026

De Wildly Intrepid Sailing — voir le bateau, l'équipage et chaque vidéo analysée de la chaîne.

The Sailing Directory Newsletter

Un e-mail avec les meilleures trouvailles de la flotte — les moments, les bateaux et les histoires qui valent la peine d'être regardés. Entrez votre adresse pour recevoir votre propre exemplaire.

Signaler un problème