Sailing Good, Bad, and Uglyvidéo

CAN WE MOVE INTO 200sqft WITH A BABY ON THE WAY?!

12 janvier 2025 · 28 min · 119K vues

Ce que couvre cette vidéo

The crew works to finish the exterior of a small structure, installing a stainless steel door handle and sealing the roofline with wood trim to prevent critter entry.0:55 Matt and Kristen cut and fit boards around roof rafters, using a sawzall for adjustments and caulk to fill gaps.14:24 Frequent rainstorms in the area repeatedly halt construction, forcing the crew to manage mud and protect their tools.12:02 To provide a clean entry point, they construct a small concrete patio, drilling angled holes into the existing foundation to anchor rebar for structural stability.20:37 The project concludes with staining the new wood trim and pouring the concrete pad.15:41 The crew discusses the feasibility of living in the 100-square-foot space with a baby on the way, weighing the completed structural improvements against the limited square footage.25:23

Regarder sur YouTube

Plus de vidéos de Sailing Good, Bad, and Ugly

IT’S FINALLY DONE!sept. 2026We Needed a Win and This Wasn’t Itaoût 2026The End Is Finally Nearaoût 2026We've Been Avoiding This and We Can't Anymoreaoût 2026

De Sailing Good, Bad, and Ugly — voir le bateau, l'équipage et chaque vidéo analysée de la chaîne.

The Sailing Directory Newsletter

Un e-mail avec les meilleures trouvailles de la flotte — les moments, les bateaux et les histoires qui valent la peine d'être regardés. Entrez votre adresse pour recevoir votre propre exemplaire.

Signaler un problème