Wind Hippie Sailingvidéo
Motoring Caused the Leak… So We Motored to Fix It WHSE183
6 juillet 2026 · 25 min · 17K vues · Lombok
Ce que couvre cette vidéo
A 27-ft Grinde sloop transits 30 nautical miles from Marina del Rey to a boatyard in northern Lombok to haul out for a shaft seal replacement.10:05 The vessel suffers from a leaking stuffing box that admits significant water into the bilge during engine operation.0:07 To prepare for the haul-out, the owner tests the engine flange bolts, which were previously seized in French Polynesia, and finds they loosen easily due to prior greasing.1:17 The 14-hour passage requires careful timing of local currents, which reach speeds that significantly impact progress through narrow channels near Gili Air.9:49 During the transit, a mast-mounted winch plate corrodes and detaches, forcing the crew to leave the mainsail partially reefed.17:11 Upon arrival at the mooring field, the crew navigates around shoals and reefs marked by channel markers.18:42 The boatyard haul-out is scheduled to address the leaking stern tube and patch areas of the hull where bottom paint was removed by jack stands and slings.Watch
Plus de vidéos de Wind Hippie Sailing
De Wind Hippie Sailing — voir le bateau, l'équipage et chaque vidéo analysée de la chaîne.
The Sailing Directory Newsletter
Un e-mail avec les meilleures trouvailles de la flotte — les moments, les bateaux et les histoires qui valent la peine d'être regardés. Entrez votre adresse pour recevoir votre propre exemplaire.



