Catamaran Mistertong vidéo

#75 Between a lovely encounter and repairs…

25 janvier 2025 · 34 min · 8K vues · Le Marin, Martinique

Ce que couvre cette vidéo

The owners of a catamaran perform structural repairs to the anchor locker and windlass mount to ensure safe anchoring. After discovering water intrusion and wood rot, they cut out the damaged sections of the deck and locker door.0:45 The repair process involves laminating new plywood backing from underneath, applying resin, and reinforcing the structure with fiberglass to restore integrity.2:15 The crew prioritizes this work to maintain the ability to anchor securely, as they rarely use marinas.9:57 They note that the project consumed significant time and resources, requiring them to pause other major boat improvements while awaiting legal updates regarding the vessel's status.28:47 The owners plan to finish the immediate windlass area repairs before halting further large-scale projects to manage their budget and mitigate risks associated with ongoing legal proceedings.32:00

Regarder sur YouTube

Plus de vidéos de Catamaran Mistertong

#258 Between interviews, small jobs, and paperwork...sept. 2026#257 When things don't go as expected....sept. 2026#255 Between portholes and delicacies ...sept. 2026#254 Sailing trip, reunion, back to work and beauty ....sept. 2026

De Catamaran Mistertong — voir le bateau, l'équipage et chaque vidéo analysée de la chaîne.

The Sailing Directory Newsletter

Un e-mail avec les meilleures trouvailles de la flotte — les moments, les bateaux et les histoires qui valent la peine d'être regardés. Entrez votre adresse pour recevoir votre propre exemplaire.

Signaler un problème