Sailing Umavidéo

Building The Ultimate Hard Dodger (part 2) | Step 431

8 mars 2025 · 19 min · 172K vues

Ce que couvre cette vidéo

The crew of the sailboat Uma constructs a custom hard dodger to replace their previous fabric version, prioritizing offshore protection and crew fatigue management. They align the foam-core panels to be symmetrical within a millimeter, then glass the exterior joints and surfaces using biaxial cloth and chopped strand mat.1:00 To accommodate the new structure, they relocate the mainsheet traveler forward of the cockpit, allowing the dodger to extend further aft and create a larger, enclosed watch-keeping space.14:20 This design change enables the installation of a folding table and provides a dry, wind-protected area for long passages.15:14 The crew plans to mount 500 to 600 watts of solar panels on the finished roof.18:03 While the structure currently remains a work in progress—awaiting interior glassing, final fairing, painting, and window installation—the crew confirms that the increased functionality of a dry, warm, and sheltered cockpit outweighs the aesthetic trade-offs of a hard dodger.13:25

Regarder sur YouTube

Plus de vidéos de Sailing Uma

Our boat won’t look the same after this | Step 495août 2026The ONE Thing We Disagreed on This Entire Refit | Step 494août 2026We Owe You The Full Storyjuil. 2026We spent $10,000 on something Pretty | Step 493juil. 2026

De Sailing Uma — voir le bateau, l'équipage et chaque vidéo analysée de la chaîne.

The Sailing Directory Newsletter

Un e-mail avec les meilleures trouvailles de la flotte — les moments, les bateaux et les histoires qui valent la peine d'être regardés. Entrez votre adresse pour recevoir votre propre exemplaire.

Signaler un problème