Sailing Yabávidéo
Our Sails Ripped on Their Last Journey Before a Massive Upgrade! — Sailing Yabá
13 septembre 2026 · 44 min · 47K vues · Recife
Ce que couvre cette vidéo
The 50-ton wooden schooner Yabá completes a 177-nautical-mile passage from an undisclosed location toward Vitória, Brazil, while managing engine cooling failures and aging sail equipment.8:59 During the 35-hour journey, the crew experiences intermittent engine overheating caused by salt-water cooling system blockages, which they resolve by clearing air bubbles from the pump circuit.36:41 The vessel’s forward sail rips under tension during a wind shift, forcing the crew to roll it up and finish the final 35 miles using the remaining three sails.31:42 Navigation involves monitoring for fishing vessels and squalls, with the crew utilizing Starlink for weather updates via PredictWind.26:55 The passage concludes with the vessel arriving after sunset, highlighting the necessity of constant engine temperature monitoring and the risks of operating with degraded, long-term rigging.37:05 The crew plans to install new sails and rigging upon arrival to prepare for a 300-nautical-mile regatta to Fernando de Noronha.44:06
Plus de vidéos de Sailing Yabá
De Sailing Yabá — voir le bateau, l'équipage et chaque vidéo analysée de la chaîne.
The Sailing Directory Newsletter
Un e-mail avec les meilleures trouvailles de la flotte — les moments, les bateaux et les histoires qui valent la peine d'être regardés. Entrez votre adresse pour recevoir votre propre exemplaire.



