Salt & Tarvidéo
Salt & Tar: Ep.274- Preparing to Make Miles
1 février 2024 · 21 min · 36K vues · Puerto Escondido, Baja California Sur
Ce que couvre cette vidéo
Garrett installs two custom wooden upgrades to his sailboat while anchored in Puerto Escondido to improve rigging function and equipment storage.0:40 To replace a bridle system that previously supported the boom, he fabricates two black locust "mast ears" bolted to the mast.2:20 These nubs provide a permanent rest for the boom jaws when the sail is lowered, allowing for the removal of the existing eye bolt and bridle.3:06 He uses a homemade wooden jig to guide a Forstner bit for countersinking bolts flush into the mast.9:05 Additionally, he constructs a custom wooden mount for a Starlink antenna, attaching it to the existing solar panel frame at the stern.10:33 To mitigate bounce in the cantilevered mount, he adds a black locust backbone for structural reinforcement.16:20 The project concludes with the installation of a watertight through-deck fitting for the antenna cable.18:38
Plus de vidéos de Salt & Tar
De Salt & Tar — voir le bateau, l'équipage et chaque vidéo analysée de la chaîne.
The Sailing Directory Newsletter
Un e-mail avec les meilleures trouvailles de la flotte — les moments, les bateaux et les histoires qui valent la peine d'être regardés. Entrez votre adresse pour recevoir votre propre exemplaire.



