VOILIER ODINvidéo

PORTHOLE FRAMES and FUEL GAUGE

29 octobre 2023 · 32 min · 7K vues

Ce que couvre cette vidéo

The owner of a sailboat performs several maintenance and interior finishing tasks, including modifying the propeller cage, installing a fuel gauge, and constructing custom wooden window frames. To accommodate a new propeller, the owner cuts the propeller cage by two centimeters using a grinder and applies anti-rust coating to the exposed metal.0:18 For the fuel system, the owner drills and taps four 6mm holes into the tank to mount a new fuel level sender, then wires the gauge to an existing switch.3:09

The interior work focuses on insulating and framing the cabin windows.7:55 The owner uses a Japanese saw to cut wooden trim pieces, adapting them to the non-square, irregular geometry of the boat’s ceiling and hull.10:02 To improve thermal efficiency, the owner installs polyurethane foam insulation around the window perimeters before securing the wooden frames with adhesive and screws.13:57 The project concludes with filling gaps with putty, sanding, and painting the frames white to match the cabin interior.21:34

Regarder sur YouTube

Plus de vidéos de VOILIER ODIN

SAILING ATYPIC AT THE PAVOIS IN LA ROCHELLEoct. 2026Sailing under asymmetric spinnaker with a Sun Odysseyaoût 2026TOP NAVIGATION - WORTH REPEATING WITHOUT HESITATIONaoût 2026WHY I'M MOVING BACK TO FRANCEjuil. 2026

De VOILIER ODIN — voir le bateau, l'équipage et chaque vidéo analysée de la chaîne.

The Sailing Directory Newsletter

Un e-mail avec les meilleures trouvailles de la flotte — les moments, les bateaux et les histoires qui valent la peine d'être regardés. Entrez votre adresse pour recevoir votre propre exemplaire.

Signaler un problème