Sailing Supernovavidéo
INSTALLING A WATER MAKER IN ONE DAY!
18 janvier 2024 · 19 min · 7K vues
Ce que couvre cette vidéo
The crew of Supernova installs a Seawater Pro water maker in a single day while anchored in a remote location.0:41 The installation process involves plumbing a boost pump into an existing spare through-hull and sea cock, wiring the boost pump controller, and mounting the high-pressure pump on a base dampened with Sikaflex to reduce vibration.2:26 The crew routes hoses and electrical lines through the boat’s interior, including the saloon and a cramped under-counter space, before connecting the control panel, flow meter, and TDS meter.10:50 They use the manufacturer’s manual for guidance, avoiding external technical support.1:02 After 15 days, the crew performs the initial system startup, checking for leaks while incrementally increasing pressure to 600 psi (40 bar).15:38 The system produces fresh water, which the crew confirms is potable after a one-hour break-in run.17:38 Following the manufacturer’s instructions and pre-planning the plumbing layout allows for a successful DIY installation in a confined space.
Plus de vidéos de Sailing Supernova
De Sailing Supernova — voir le bateau, l'équipage et chaque vidéo analysée de la chaîne.
The Sailing Directory Newsletter
Un e-mail avec les meilleures trouvailles de la flotte — les moments, les bateaux et les histoires qui valent la peine d'être regardés. Entrez votre adresse pour recevoir votre propre exemplaire.



