Acorn To Arabellavidéo

Spring Boat Projects Begin | Fixing Tools & Rebuilding Aboard Arabella

10 avril 2026 · 36 min · 27K vues

Ce que couvre cette vidéo

Steve performs spring maintenance and interior modifications aboard the wooden boat *Arabella* while wintering in Newfoundland. He repairs a long-held hatchet by drilling out the broken handle, fitting a new piece of wood, and securing the head with a wedge.2:28 To address structural issues with the boat's transom, he planes local larch boards to three-quarters of an inch thick, jointing the edges with a Veritas plane before gluing them into a panel for future installation.14:55 He also disassembles and rebuilds a food storage unit that had become unstable, using Total Boat Thixo Fast Cure epoxy to stabilize the new panel.24:08 The project remains unfinished, as cold temperatures prevent immediate painting and varnishing.33:15 Steve emphasizes the importance of building boat interiors that are easily modified or repaired, citing the utility of using a reciprocating saw for future refits.30:39 He plans to continue these upgrades to prepare the vessel for the upcoming cruising season.

Regarder sur YouTube

Plus de vidéos de Acorn To Arabella

We're Climbing a Wall No One Has Ever Climbed Before | Rock Climbing on Newfoundland's South Coastjuil. 2026Exploring Newfoundland's Unclimbed Coastal Cliffs by Sailboatjuil. 2026Fjord Hopping | Arabella Sails East Toward The Nuddickjuil. 2026Replacing Victoria's 100+ Year Old Mahogany Transomjuin 2026

De Acorn To Arabella — voir le bateau, l'équipage et chaque vidéo analysée de la chaîne.

The Sailing Directory Newsletter

Un e-mail avec les meilleures trouvailles de la flotte — les moments, les bateaux et les histoires qui valent la peine d'être regardés. Entrez votre adresse pour recevoir votre propre exemplaire.

Signaler un problème