Catamaran Mistertong vidéo
#241 Friends arriving, time to rest soon!!
4 août 2026 · 54 min · 9K vues
Ce que couvre cette vidéo
The owners of a catamaran are completing a multi-month refit in a boatyard, focusing on the final stages of applying Coppercoat antifouling and finishing the hull and nacelle paint.4:08 After applying the Coppercoat, the crew waits for the required 48-hour polymerization period before removing protective masking to avoid damaging the finish or trapping solvents.3:05 They address minor paint runs on the saildrive housing by sanding and re-priming the area.9:26 The project also includes installing solar panel support struts using epoxy inserts and preparing the vessel for relaunch.8:05 The crew manages interior organization and minor plumbing repairs, including a valve system for the black water tank and toilet intake.29:43 Despite the physical strain of the four-month project, the owners prepare for the arrival of friends and plan to transition from the intensive refit schedule to routine maintenance and sailing.26:25 The work concludes with final cleaning and staging of deck cushions as they prepare to return the boat to the water.37:35
Plus de vidéos de Catamaran Mistertong
De Catamaran Mistertong — voir le bateau, l'équipage et chaque vidéo analysée de la chaîne.
The Sailing Directory Newsletter
Un e-mail avec les meilleures trouvailles de la flotte — les moments, les bateaux et les histoires qui valent la peine d'être regardés. Entrez votre adresse pour recevoir votre propre exemplaire.



