Catamaran Mistertong vidéo

#262 Installing the cleats on our davit

13 octobre 2026 · 24 min · 11K vues

Ce que couvre cette vidéo

The owners of the catamaran Mistertong prepare for relaunch after a prolonged period of being hauled out, focusing on final maintenance tasks and organizing the vessel. The crew installs two plastic cleats on the stern arch to secure the dinghy lines, using a drill, a tap to thread the aluminum, and Tef-Gel to prevent galvanic corrosion between the stainless steel screws and the aluminum structure.8:26 Maintenance efforts include charging the engine batteries, though the starboard battery fails to hold a charge and triggers an error on the charger, indicating a likely need for replacement.10:45 The crew also plans to refill water tanks, run the engines, and sand and paint the exterior hull sides before the boat returns to the water.4:34 A legal dispute involving a fence blocking their access to the water has been resolved in their favor by a judge, though the crew awaits the physical removal of the barrier to determine their exact launch date.17:07

Regarder sur YouTube

Plus de vidéos de Catamaran Mistertong

#261 Finally some good news ....oct. 2026#260 Little DIY projects to keep your spirits up...oct. 2026#259 On the agenda: relaxing with our friends...oct. 2026#258 Between interviews, small jobs, and paperwork...sept. 2026

De Catamaran Mistertong — voir le bateau, l'équipage et chaque vidéo analysée de la chaîne.

The Sailing Directory Newsletter

Un e-mail avec les meilleures trouvailles de la flotte — les moments, les bateaux et les histoires qui valent la peine d'être regardés. Entrez votre adresse pour recevoir votre propre exemplaire.

Signaler un problème