Project Brupegvidéo
Brupeg's Bathroom gets worked on (Ep. 09)
28 décembre 2017 · 15 min · 17K vues · Australia
Ce que couvre cette vidéo
The bathroom renovation on the steel vessel involves installing a custom ventilation system, plumbing fixtures, and surface finishing. To address poor airflow, a 4-inch bilge blower rated at 270 cubic feet per minute is mounted to the exterior wheelhouse wall, connected to the bathroom via 4-inch downpipe and sealed with Sika.6:22 The blower exhausts air through a 180-degree pipe bend to prevent water ingress.5:00 Plumbing installation includes a copper pipe assembly for a single-cold-tap sink and a shower mixer, requiring the trimming of threaded fittings by 5mm to ensure a flush fit against the bulkhead.8:38 The bathroom interior features coved corners to prevent mold accumulation and is coated with Jodan Mastic 90.14:20 Future plans include leveling the floor with cement to create a drainage slope toward the drain hole, followed by tiling.14:41 The owner notes that rolling paint with Mohair rollers requires significant sanding with 240-grit paper to achieve a smooth finish compared to spraying.13:15
Plus de vidéos de Project Brupeg
De Project Brupeg — voir le bateau, l'équipage et chaque vidéo analysée de la chaîne.
The Sailing Directory Newsletter
Un e-mail avec les meilleures trouvailles de la flotte — les moments, les bateaux et les histoires qui valent la peine d'être regardés. Entrez votre adresse pour recevoir votre propre exemplaire.



