Crunch time before the big Day [E264]
13 octobre 2023 · 14 min · 668 vues · Foundry Cove Marina, Ontario
Ce que couvre cette vidéo
Maintenance at Foundry Cove Marina focuses on servicing 11 through-hull fittings and seacocks before the spring freeze.2:33 The crew identifies several jammed cone-style seacocks, including three waste-related valves and one drain valve.3:27 Using penetrating fluid, heat, and a ratchet on the square handle, the crew frees the seized valves.8:29 Poor original installation prevents access to the nuts on two large cone valves, requiring potential removal of the entire through-hull assembly.4:48 The crew also reroutes a waste hose by removing an unused 4-aught cable from the bilge to clear space.11:57 During engine compartment inspections, the crew discovers a coolant leak originating from a loose or unsealed plug on the heat exchanger.13:06 Additionally, they find the alternator wires disconnected and taped, suggesting a failed unit.13:15 The project involves clearing excess, poorly routed wiring for instruments and the wind meter to improve bilge organization.14:19
Plus de vidéos de Wildly Intrepid Sailing
De Wildly Intrepid Sailing — voir le bateau, l'équipage et chaque vidéo analysée de la chaîne.
The Sailing Directory Newsletter
Un e-mail avec les meilleures trouvailles de la flotte — les moments, les bateaux et les histoires qui valent la peine d'être regardés. Entrez votre adresse pour recevoir votre propre exemplaire.



