Sven Yrvindvideo
29 July 2025 Work on the Hatch
28 luglio 2025 · 2 min · 2K visualizzazioni
Cosa tratta questo video
Sven Yrvind constructs custom hatches for his vessel using two layers of 9-millimeter plywood to achieve increased thickness.▶ 0:40 He utilizes Divinycell H80 foam as a core material for both the forehatch and the after hatch.▶ 0:18 To prevent the plywood layers from sliding during the bonding process, he secures them with two small nails before applying polyurethane glue.▶ 0:57 The assembly process involves laminating one side of the hatch, allowing it to cure, and then repeating the process on the reverse side.▶ 1:49 For the hatch closing mechanism, he fabricates custom hooks by welding angle iron to flat iron stock, drilling 10-millimeter holes into the resulting hardware.▶ 1:27 These components provide a secure fit for the hatch covers once the lamination and shaping are complete.
Altro da Sven Yrvind
Da Sven Yrvind — guarda la barca, l'equipaggio e ogni video analizzato del canale.
The Sailing Directory Newsletter
Una email con le migliori scoperte della flotta — i momenti, le barche e le storie che meritano il tuo tempo di visione. Inserisci il tuo indirizzo per riceverne una copia.



