CATAMARAN BUILD - The Backbone of our Water Tanks (MJ Sailing Ep 204)
26 settembre 2021 · 19 min · 91K visualizzazioni · Kent Island
Cosa tratta questo video
Matt and Jessica continue the construction of their 42-foot catamaran by installing structural webbing forward of bulkhead four and bulkhead five.9:26 These transverse and longitudinal webs create a series of individual, watertight cells that serve as a secondary hull bottom, providing buoyancy redundancy in the event of a puncture.1:48 The builders reject filling these compartments with closed-cell foam, citing unnecessary weight, potential waterlogging, and the inherent buoyancy provided by the cellular structure itself.2:18 They also avoid running plumbing or electrical conduit through these bulkheads to prevent potential leak points, opting instead to route all systems inboard above the waterline.3:47 The construction process involves trimming CNC-cut panels with a circular saw, scuff-sanding bonding surfaces, creating coves with thickened vinyl ester resin, and laminating the joints with 12-ounce double-bias fiberglass.13:36 Tools are maintained between sessions by soaking rollers in Total Boat EcoSolvent.14:19
Altro da MJ Sailing
Da MJ Sailing — guarda la barca, l'equipaggio e ogni video analizzato del canale.
The Sailing Directory Newsletter
Una email con le migliori scoperte della flotta — i momenti, le barche e le storie che meritano il tuo tempo di visione. Inserisci il tuo indirizzo per riceverne una copia.