MJ Sailingvideo

CATAMARAN BUILD - The Backbone of our Water Tanks (MJ Sailing Ep 204)

September 26, 2021 · 19 min · 91K views · Kent Island

What this video covers

Matt and Jessica continue the construction of their 42-foot catamaran by installing structural webbing forward of bulkhead four and bulkhead five.9:26 These transverse and longitudinal webs create a series of individual, watertight cells that serve as a secondary hull bottom, providing buoyancy redundancy in the event of a puncture.1:48 The builders reject filling these compartments with closed-cell foam, citing unnecessary weight, potential waterlogging, and the inherent buoyancy provided by the cellular structure itself.2:18 They also avoid running plumbing or electrical conduit through these bulkheads to prevent potential leak points, opting instead to route all systems inboard above the waterline.3:47 The construction process involves trimming CNC-cut panels with a circular saw, scuff-sanding bonding surfaces, creating coves with thickened vinyl ester resin, and laminating the joints with 12-ounce double-bias fiberglass.13:36 Tools are maintained between sessions by soaking rollers in Total Boat EcoSolvent.14:19

Watch on YouTube

More from MJ Sailing

How Can a Light Switch Be SO COMPLICATED??!! (MJ Sailing - Episode 381)Aug 2026Painting the Accent Walls On Our Home Built Catamaran (MJ Sailing - Episode 380)Jul 2026The Details That Keep a Boat Dry (MJ Sailing - Episode 379)Jun 2026Preparing Our Catamaran for Paint—and Me for Captain's SchoolJun 2026

From MJ Sailing — see the channel’s boat, crew, and every analyzed video.

The Sailing Directory Newsletter

One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.

Report an issue