Sailing Umavideo

The Solution To Our Core Problem | Step 395

14 giugno 2024 · 22 min · 114K visualizzazioni · Italy

Cosa tratta questo video

The crew of the 45-ft sailboat Uma repairs delaminated fiberglass deck sections caused by a dry layup of balsa core.1:14 To fix existing voids, they drill holes at the top and bottom of the delaminated areas and inject resin with a syringe, allowing air to escape through the upper holes.5:31 For subsequent fiberglass work, they install a split-system air conditioner to lower the ambient temperature, which prevents the resin from kicking off too quickly and allows sufficient time to wet out the balsa core and remove air bubbles.17:51 The installation requires hiring local technicians to purge the refrigerant lines and charge the system.3:57 To protect against fiberglass dust and chemical fumes while preventing skin irritation, the crew adopts a full-face respirator mask paired with a Tyvek hood.13:44 The combination of pre-wetting the balsa core and maintaining a cooler workspace significantly improves the quality of the laminate, resulting in a stiffer cabin top.20:29

Guarda su YouTube

Altro da Sailing Uma

We're Finally Setting Sail Again!set 20264 Hours to Rig Solar for an 8-Month Solo Circumnavigationset 2026Solar Sponsor Backed Out Before Sailing Around the World !set 2026Our boat won’t look the same after this | Step 495ago 2026

Da Sailing Uma — guarda la barca, l'equipaggio e ogni video analizzato del canale.

The Sailing Directory Newsletter

Una email con le migliori scoperte della flotta — i momenti, le barche e le storie che meritano il tuo tempo di visione. Inserisci il tuo indirizzo per riceverne una copia.

Segnala un problema