Sailing Umavídeo

The Solution To Our Core Problem | Step 395

14 de junho de 2024 · 22 min · 114K visualizações · Italy

O que este vídeo aborda

The crew of the 45-ft sailboat Uma repairs delaminated fiberglass deck sections caused by a dry layup of balsa core.1:14 To fix existing voids, they drill holes at the top and bottom of the delaminated areas and inject resin with a syringe, allowing air to escape through the upper holes.5:31 For subsequent fiberglass work, they install a split-system air conditioner to lower the ambient temperature, which prevents the resin from kicking off too quickly and allows sufficient time to wet out the balsa core and remove air bubbles.17:51 The installation requires hiring local technicians to purge the refrigerant lines and charge the system.3:57 To protect against fiberglass dust and chemical fumes while preventing skin irritation, the crew adopts a full-face respirator mask paired with a Tyvek hood.13:44 The combination of pre-wetting the balsa core and maintaining a cooler workspace significantly improves the quality of the laminate, resulting in a stiffer cabin top.20:29

Ver no YouTube

Mais de Sailing Uma

We're Finally Setting Sail Again!09/20264 Hours to Rig Solar for an 8-Month Solo Circumnavigation09/2026Solar Sponsor Backed Out Before Sailing Around the World !09/2026Our boat won’t look the same after this | Step 49508/2026

De Sailing Uma — veja o barco, a tripulação e todos os vídeos analisados do canal.

The Sailing Directory Newsletter

Um email com os melhores achados da frota — os momentos, barcos e histórias que valem o seu tempo de visualização. Insira o seu endereço para receber a sua cópia.

Reportar um problema